by Catherine Howlett | February 1, 2012 2:19 pm
The majority of large-scale design/ construction projects revolve around a single concept known as the owner’s project requirements (OPR). Developed throughout each project phase, these criteria essentially define the performance specifications for the building as a whole.
There are dozens of factors considered in establishing OPR for a given project, including energy consumption, environment, safety, security, durability, and operation. Design aspects of the building enclosure have also evolved dramatically over the past decade—new and improved materials, better understanding of how enclosures perform, updated codes and standards, building information modeling (BIM), and additional project delivery methods (e.g. design-build). Each of these aspects has an impact on the others, which has invariably resulted in a more complex process of how a project unfolds and is ultimately completed.
This increased complexity often means significant time (a valuable resource) in ensuring proper performance test standards are specified, building codes are satisfied, the design is constructible, and, ultimately, OPR is satisfied. The recently published ASTM E2813, Standard Practice for Building Enclosure Commissioning, provides the architect of record (AOR) a single-source guideline for establishing OPR and providing a clear pathway to accomplishing each project phase to satisfy the requirements related to the building enclosure (Figure 1).
ASTM E2813 is essentially a vehicle for combining existing requirements from dozens of test standards covering several building enclosure elements, as well as American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE) Guideline 0, The Commissioning Process, and National Institute of Building Sciences (NIBS) Guideline 3, Building Enclosure Commissioning Process. Similarly, the various design, performance, and operational requirements covering the elements comprising the building enclosure can be combined into a single specification section that references ASTM E2813. In fact, Section 01 91 19.43–Exterior Enclosure Commissioning has been included in MasterFormat since at least the 2004 edition, but has yet to be implemented on a widespread basis. The AOR can now simply reference one section that includes such references in the individual specification sections.
A building enclosure commissioning (BECx) process to ensure high performance provides myriad benefits to the owner, AOR, and contractor (similar to the processes by which mechanical, electrical, and plumbing systems are commissioned to verify compliance with OPR). Benefits of BECx include:
As mentioned, current traditional systems requiring commissioning include mechanical, electrical, and plumbing. While these systems have evolved in their function and complexity, so have the elements of the building enclosure. In the authors’ interactions with clients and colleagues across the country, there has been as steady increase in attention to BECx and requirements included in project specifications. At this point, government and institutional facilities appear to be leading the charge for these requirements, but the private sector is steadily falling in line. There are multiple scenarios as to how the BECxA is integrated within the project—ultimately, the OPR would establish the function and relationship of the BECxA with the team.
Establishing the OPR and levels of BECx
The newly created ASTM E2813 Annex A1, “OPR Development Guideline,” outlines the establishment of the owner’s project requirements in consideration of energy, environment, safety, security, durability, sustainability, and operation. This guideline is a prescriptive method that includes a series of questions representing “the minimum range of issues and concerns that must be considered under this practice during the development of the OPR to determine the level of commissioning and functional performance testing.” These queries cover general building characteristics, including:
From this process, the owner, AOR, building enclosure commissioning agent (BECxA), and commissioning agent (CxA) create a scope of consulting and testing services.
ASTM E2813 establishes two levels of building enclosure commissioning: fundamental and enhanced. These levels are similar in terms of the BECxA’s role, and both are defined as architecture/engineering-related technical services performed on the owner’s behalf. In fundamental BECx:
In enhanced BECx:
Core competencies
Successful commissioning of the building enclosure requires specific areas of expertise and experience in areas generally outside the capabilities of most mechanical/electrical/plumbing (MEP) commissioning firms. ASTM E2813 recognizes the need for qualified BECx firms, and the standard therefore requires agents to demonstrate a level of proficiency in the following building and materials science areas:
Firms must also be adept in understanding procurement and project delivery, along with performance test standards and methodologies for laboratory, mockup, and in-situ field tests.
While ASTM E2813 does not provide strict guidelines for what constitutes the “level of proficiency” in each of these core competencies, caution should be taken when selecting potential BECxA firms. Those companies with years of project experience in the core competencies generally possess the knowledge and abilities to contribute to a successful project. Potential BECx firms should be carefully vetted as part of the selection process to ensure a successful installation and performance of building components that are arguably the highest risk area of design and construction.
Phase descriptions
ASTM E2813 outlines a BECx process similar to those described in ASHRAE 0 and NIBS Guideline 3, and defines it in each of the project phases. The roles and responsibilities of the BECxA evolve as the project progresses; close communication with the owner, AOR, and general contractor is paramount to the commissioning agent’s successful integration with the project team. Depending on various factors, including the contract delivery method and OPR, the BECxA could be positioned in several locations within the project team. Possible scenarios are show in Figure 4.
The BECxA could be part of various enclosure commissioning activities for both fundamental and enhanced routes, depending on the required level of involvement. With the exception of the aforementioned key differences, the services provided in both processes are nearly identical. They include:
Pre-design phase
Design phase
Pre-construction phase
Construction phase
Occupancy and operations phase
BECx performance testing requirements
Table A2.1 in ASTM E2813 Annex 2 includes a comprehensive list of BECx performance testing requirements. Approximately 90 test standards are listed, including those from:
These designations cover optional and required laboratory and field tests for various measurable metrics, including:
The latter columns in table A2.1 designate whether each test is optional
or mandatory, and mockup or in-situ. In considering whether tests are actually ‘mandatory,’ it is worth discussion with the owner and AOR whether these requirements would lend to satisfying the OPR for the specific project.
Applying the standard to projects
Located in Fort Hood, Texas, the new Carl R. Darnall Army Medical Center project includes the design and construction of an 87,980-m2 (947,000-sf), $534-million facility consisting of a six-story hospital, three out-patient clinic buildings, and three parking garages. It will replace the adjacent original 55,740-m2 (600,000-sf) Darnall Hospital (Figure 6).
The hospital serves roughly 45,000 soldiers, as well as nearly 125,000 family members and retirees. An important feature of the new hospital is the approximately 9290-m2 (100,000-sf) clinic dedicated to behavioral health services, which provides mental and physical care for soldiers. The BECx services provided are listed in Figure 7.
Conclusion
There is no doubt there is a growing movement in the construction field toward building enclosure commissioning. The individual components have been around for years, but it seems this most recent push forward by ASTM to compile them into a single standard simplifies the effort necessary to incorporate high-performance building enclosure design into construction specifications.
Merely referencing an ASTM standard in a specification might not convey the design intent for building enclosure. As with any specification, it should be fully developed to clearly identify the qualifications of the BECxA[9] and define project-specific procedures in Part 3.
Stuart Mitchell, PE, is a project manager in the Building Science Group at Pie Consulting and Engineering. He is responsible for design development assistance, plan/specification peer review, and quality assurance field observations related to water management systems, air barriers, vapor retarders, and thermal insulation. Mitchell is involved in field performance testing and diagnostic evaluations of fenestration, curtain walls, and claddings, as well as whole building air barrier testing. He has extensive experience in the development of rehabilitative design documents and project management. Mitchell can be contacted at smitchell@pieglobal.com[10].
Jeff Crowe, MS, EI, is a senior building science specialist in Pie’s Building Science Group. His responsibilities include design development assistance, plan and specification reviews, quality assurance field observations, building performance testing, and diagnostics on both new and rehabilitation construction projects. Crowe has also served as a restoration and design engineer for a specialty engineering firm, providing design and consulting services for the construction and rehabilitation of concrete parking structures across the United States. He can be reached at jcrowe@pieglobal.com[11].
Source URL: https://www.constructionspecifier.com/astm-e2813-and-the-owners-project-requirements/