An abandoned sugar factory can be dangerous—structurally unsound and riddled with asbestos. Amalgamated Sugar made the commitment to abate and demolish a site that included 11 smaller buildings and a mill.
+ Read More
|
The country’s drinking-water infrastructure recently received a ‘D’ on the American Society of Civil Engineers’ (ASCE’s) Infrastructure Report Card—a nearly failing grade due to the millions of pipes in need of replacement.
+ Read More
|
Construction claims are becoming increasingly prevalent and expensive, and many are delay- or impact-related. This article, the third in a four-part series, delves into how the project manager can reduce claims by mitigating delays and monitoring project risk.
+ Read More
|
You may perhaps be thinking: “Isn’t the title of this article a bit over-dramatic?" However, this is an important topic that is rarely well-appreciated by owners and design professionals, and one few in the design community think much about.
+ Read More
|
Acoustics has an ever-increasing influence on modern commercial construction. There are guidelines stating how loud classrooms should be, how much noise workers can be exposed to, and even the level of privacy needed in sensitive spaces.
+ Read More
|
The commercial restroom is at the epicenter of a critical environmental consideration—water. Recent innovations have elevated the commercial restroom as an opportunity to drive sustainability, performance, and design for architects, engineers, and project managers.
+ Read More
|
Museums employ two key strategies for lighting works of art: daylighting and artificial or electric lighting. (The author would like to thank Thomas Holzmann and Gregory Weithman, AIA, for their contributions to this article.)
+ Read More
|
Radon is a problem found throughout the country, especially in Colorado and northern states bordering Canada. Levels tend to fluctuate based on weather and ventilation, so great variances can exist between regions, structures, or even rooms within the same building.
+ Read More
|
An efficient project manager should also know how to manage documents and contracts. What does he or she need to know?
+ Read More
|
This article, the first in a four-part series, will give design/construction professionals an overview of what a project manager must do as the project progresses.
+ Read More
|
|
|