Exterior door assemblies not covered by Florida Building Code (FBC) 1715.5.2, “Exterior Windows, Siding, and Patio Glass,” or FBC 1715.5.3.1, “Exterior Door Assemblies,” shall be tested for structural integrity in accordance with Procedure A of ASTM E330, Standard Test Method for Structural Performance of Exterior Windows, Doors, Skylight,s and...
+ Read More
|
Inadequate insulation and air leakage are leading causes of energy waste in most projects, and coatings selection can play a big role in reducing these inefficiencies. This article examines use of coatings in applications as diverse as cool roofs, air barriers, infrared (IR) reflective pigments, and radiant heat barriers.
+ Read More
|
As the push toward renewable energy continues, roofing suppliers have been receiving an increased number of inquiries from photovoltaic (PV) providers regarding installation of these systems on warranted roof systems.
+ Read More
|
Plaza construction typically incorporates various products from different manufacturers intended to provide the thermal resistance, water management, structural capacity, and wearing surface needed to meet a particular project’s requirements.
+ Read More
|
Exterior wall systems have received a lot of well-deserved attention as no amount of ink has been spared over the last decade writing about the critical importance of a tight, fire safe, and tested building enclosure.
+ Read More
|
One of the first commonly employed weep details was the sash cord or ‘rope’ weep. In some cases, this detail was expanded with sections of the sash cord laid in the cavity and then extended through the wall, usually at a head joint.
+ Read More
|
This article focuses on original building design evaluation (including expansion joints) and diagnostics of cracks in brick veneer masonry walls. Proper rehabilitation techniques are reviewed, along with solid masonry wall system drainage design, and evaluation of diagonal, vertical, and horizontal cracks.
+ Read More
|
The welcome center at Florida’s Port Canaveral space shuttle facility is Exploration Tower. Clad in aluminum panels and a curtain wall assembly, it is also the first major project to be finished with paint that changes color depending on the light reflectance.
+ Read More
|
Functionality is the ultimate goal for athletic flooring. High-performance assemblies can provide durability, shock absorption, acoustics, and aesthetics. Now produced from recycled tires, rubber is a high-performance, sustainable material often specified for this application.
+ Read More
|
For decades, the U.S. design and construction industry has turned to sprayed polyurethane foam to insulate and air seal buildings. When used as a roofing material, its monolithic nature allows for a seamless, self-flashing application that can keep out water.
+ Read More
|
|
|